Welcome to B2 Oil and Gas Project Limited, a leading construction company specializing in providing innovative solutions for industrial projects. Today, we are excited to share the success story of our recent project: The Construction Saver Pit at Oredo Flow-Station OML 111.

Our client, Nigerian Petroleum Development Company (NPDC), entrusted B2 with the crucial task of constructing a sump/saver pit to enhance their operational efficiency and ensure environmental compliance. This project required our expertise in excavation, concrete work, and precise engineering to deliver exceptional results.

From the initial planning stages, B2 collaborated closely with our client’s engineering team to understand their specific requirements and objectives. B2 conducted a comprehensive site analysis, considering factors such as soil composition, water table levels, and regulatory guidelines to ensure the pit’s design and construction met the highest standards.

The construction of the saver pit involved a multi-step process that emphasized quality, safety, and environmental considerations. B2 skilled team of engineers and technicians meticulously executed each phase, adhering to industry best practices and utilizing advanced construction techniques.

Excavation was conducted with precision, ensuring the pit’s dimensions and depth aligned with our client’s specifications. B2 utilized cutting-edge equipment and techniques to achieve optimal results while maintaining a safe work environment.

The next phase involved the installation of reinforcing steel bars to provide structural strength to the pit. B2 experienced steelworkers meticulously placed and secured the rebar in accordance with engineering plans and design specifications.

Once the reinforcement was in place, our team carefully poured and cured high-quality concrete to form the pit’s walls and base. B2 closely monitored the curing process to ensure proper hydration and strength development, creating a durable and long-lasting structure.

To guarantee the saver pit’s functionality, B2 integrated appropriate drainage systems and pumps to efficiently collect and manage fluids, preventing any environmental contamination. B2 also incorporated safety features such as grating and guardrails to ensure the well-being of personnel accessing the pit.

Throughout the project, B2 prioritized effective project management and open communication with our client. We provided regular updates on progress, addressing any concerns promptly and collaboratively. Our client’s satisfaction and their operational needs were at the forefront of every decision we made.

Upon completion in 2017, the constructed saver pit stood as a testament to our commitment to excellence. It served as a critical component of our client’s industrial infrastructure, providing an efficient and environmentally compliant solution for fluid management.

B2 remains dedicated in our ability to deliver exceptional results on complex construction projects. Our skilled workforce, advanced technology, and commitment to safety and quality set us apart in the industry.

Join B2 Oil and Gas Project Limited on this journey toward excellence and client satisfaction, where we can bring your vision to life, one project at a time.

Project Highlights

This project witnessed several highlights including but not limited to
  • 100% Secure, no community disturbance.
  • Easy workflow, every part of the project was delivered on time
  • More benefit, workers on this project were rewarded for their contribution to delivering the project before schedule.